API contract testing

The integration test passes, but the client crashes. That happens when the server changed the shape of the response and the test only checked for a 200. A contract test closes exactly that gap.

What a contract is

A contract is an agreement about the request and the response: paths, methods, status codes, fields, types, requiredness, null, and the formats of dates and errors. The contract does not describe how the server computes the data — only what the client sees.

{
  "order_id": 7781,
  "customer": {"id": 7, "name": "Ann"},
  "total": 1200,
  "status": "paid"
}

The schema pins down: order_id is an integer, customer is an object with required id and name, total is a number, status is one of the enum values.

Three levels of checking

  1. Response schema. Validate a real response against a JSON Schema or OpenAPI. Catches a missing field, a wrong type, an unexpected null.
  2. Consumer-driven contract. The client publishes which fields and status codes it actually uses. The provider verifies its build against those expectations. The tool does not matter here: Pact is popular, but not the only option.
  3. Version compatibility. Run the contracts of published client versions against the new server build. This is the step that catches a broken old mobile app.

What counts as a breaking change

  • a field is removed or renamed;
  • a type changed (int → string);
  • a field was optional and became required;
  • the set of allowed values got narrower;
  • the meaning of null changed (previously absent, now null arrives);
  • the error code or the error body format changed.

Adding an optional field is usually safe. But if the client validates the schema strictly (additionalProperties: false) or the field is required in its model, even a "harmless" addition breaks it.

Wiring it into CI

  1. Keep the schema next to the code and version it.
  2. On the provider build, validate responses in every scenario, including errors and empty lists.
  3. Run the contracts of the latest supported client versions.
  4. Diff the new schema against the old one: a removal or a narrowing fails the build.
  5. Publish the contract version together with the release.

What a contract test does not do

It does not check business logic. A response can match the schema perfectly and still be wrong: the wrong amount, the wrong order. Contract and scenario tests complement each other; they do not replace each other.

Another boundary is behavioural compatibility. The schema allows status: null, but the client cannot handle it. Such things are stated in the contract explicitly: nullable: false or a dedicated test for that scenario.

A short checklist

  • The contract covers success responses and errors.
  • There is a test for a removed and a renamed field.
  • Old client versions are checked in CI.
  • A breaking change requires an API version or a transition period.
  • The schema and the code are released together.